Site Readiness & Installation
Item ID: 6PU-NRF
SKU: Site-Readiness-&-Installation
Standard Installation Scope (Included)
Unless otherwise stated in writing, quoted installation pricing is based on the following assumptions:
● All required services (electrical, gas, water, waste, data) are:
○ Pre-installed
○ Compliant with current Australian Standards and local authority requirements
○ Located within 1 metre of the final equipment position
● Equipment is:
○ Installed in its final position
○ Levelled and secured where required
○ Connected to existing compliant services within 1 metre
○ Tested for basic operational functionality
● Installation occurs during standard business hours (Monday–Friday)
Contact For Price - POA
Add this item to a quote and our sales team will price it for you.
Standard Installation Scope (Included)
Unless otherwise stated in writing, quoted installation pricing is based on the following assumptions:
● All required services (electrical, gas, water, waste, data) are:
○ Pre-installed
○ Compliant with current Australian Standards and local authority requirements
○ Located within 1 metre of the final equipment position
● Equipment is:
○ Installed in its final position
○ Levelled and secured where required
○ Connected to existing compliant services within 1 metre
○ Tested for basic operational functionality
● Installation occurs during standard business hours (Monday–Friday)
Exclusions – Not Included in Standard Installation
The following works are strictly excluded unless specifically quoted:
● Extension, relocation, or modification of services beyond 1 metre
● New service runs, trenching, wall or floor penetrations
● Electrical switchboard upgrades or additional circuits
● Gas meter upgrades, regulator changes, or capacity increases
● Plumbing alterations, floor waste installation, or drainage works
● Core drilling, cutting, or building works of any kind
● Make-good works (patching, painting, tiling, cabinetry modifications)
● Compliance rectification of existing non-conforming services
● After-hours, weekend, or staged installations
● Commissioning requiring third-party certification beyond standard testing Customer Responsibilities
The customer is responsible for ensuring:
● All services are installed, compliant, and ready prior to delivery
● Clear and unrestricted access to the site
● Equipment pathways meet size, access, and weight requirements
● Floors are level, finished, and capable of supporting equipment loads
● Any required isolation switches, valves, or shut-offs are installed
Delays or non-compliant services may result in abortive visits, additional costs, and installation rescheduling.
Variations & Additional Costs
If services are located beyond 1 metre, or additional works are required:
● Installation will be treated as a variation or may not be able to be completed
● Additional labour, materials, and subcontractor costs will apply
● Variations must be approved in writing prior to works proceeding
You may also like
HoshizakiHoshizaki HRF-127 - Dual-Temp 2 Long Door
Item ID: 9NX-R4E
SKU: HOS-97000190
ExquisiteExquisite USC550H Four Solid Doors Underbench Storage Refrigerators
Item ID: HME-3HC
SKU: EXQ-USC550H
SMEG ProfessionalSmeg Professional SPG405MAU - Undercounter Glasswasher Single Phase 400mm
Item ID: KDE-5UH
SKU: SME-SPG405MAU
AG EquipmentAG Equipment B500G - 477L Upright Double Glass Door Display / Backbar Fridge - Black
Item ID: VF1-7WR
SKU: AG-B500G
AG EquipmentAG Equipment B300G - 300L Upright Glass Door Display / Backbar Fridge - Black
Item ID: N43-PEM
SKU: AG-B300G
ThermasterThermaster SC248SD - Double Sliding Door Drink Cooler
Item ID: 42N-729
SKU: FED-SC248SD
CyberChill PrecisionCyberChill CCB1000 - 1 Door Upright Bottom Mount Merchandiser Chiller 1000L
Item ID: VPA-7F2
SKU: CYB-CCB1000
Call for Price